Los Angeles County · Los Angeles area

ADU Cost in Torrance, CA (2026)

A new 750 sq ft detached ADU in Torrance costs about $354,200 all-in by our estimate, with most projects landing between $312k and $418k. That is about 12% above the California average. A garage conversion is the budget option at around $121,100.

Your ADU

ADU type
750 sq ft
Finish level
Extras
Financing & rent

Torrance ADU costs by type

Estimated all-in cost in Torrance, standard finish, average site. Includes design, permits, utilities and contingency.
TypeTypical sizeLikely rangePer sq ft
Detached ADU750 sq ft$312k – $418k$472
Attached ADU600 sq ft$236k – $316k$447
Garage conversion400 sq ft$107k – $143k$303
Junior ADU (JADU)350 sq ft$76k – $102k$248
Prefab / modular600 sq ft$237k – $317k$448

What drives ADU costs in Torrance

Labor and permit costs in the Los Angeles area sit above the state average, and many lots are small, so crane access and tight side yards can add to site work. Our model uses a construction cost index of 1.12 for Torrance compared with 1.00 for the state as a whole.

Your own lot matters as much as the city. A flat lot with the sewer and electric close to the ADU site can be tens of thousands of dollars cheaper than a sloped lot with long utility runs. Choose the site conditions in the calculator above to see the difference.

ADU rent and payback in Torrance

UnitEst. monthly rent
Studio ADU$1,900
1-bedroom ADU$2,300
2-bedroom ADU$3,000
Junior ADU (JADU)$1,500

For a 750 sq ft 1-bedroom detached ADU, net rent after vacancy, maintenance, insurance and added property tax is about $1,800/month. Financed fully at an example 8% over 20 years, the loan payment would be about $3,000/month, so rent covers about 62% of the payment. Paid in cash, the ADU pays back in roughly 16 years. See the rental income calculator to test other numbers.

Permits in Torrance

ADUs in Torrance follow California state ADU law, which limits what the city can require. Key points: approval within 60 days of a complete application, no public hearing, no impact fees under 750 sq ft, side and rear setbacks of no more than 4 feet, and no replacement parking when you convert a garage. Read our California ADU laws guide and permit fees guide, and confirm local details with the Torrance planning and building department.

Torrance ADU FAQ

How much does an ADU cost in Torrance?

We estimate about $354,200 for a 750 sq ft detached ADU in Torrance (likely range $312k–$418k), about $121,100 for a 400 sq ft garage conversion, and about $86,800 for a 350 sq ft junior ADU. These include design, permits, utilities and a 10% contingency.

How much can I rent an ADU for in Torrance?

A typical 1-bedroom ADU in Torrance rents for around $2,300 per month by our estimate, a studio for about $1,900 and a 2-bedroom for about $3,000. Check current local listings for similar units.

Is building an ADU in Torrance worth it?

With an estimated net rent of about $1,800 per month after vacancy, maintenance, insurance and added property tax, a 750 sq ft detached ADU would take roughly 16 years to pay back its cost from rent alone. A garage conversion pays back much faster because it costs less.

Do I need a permit for an ADU in Torrance?

Yes. ADUs in Torrance need a building permit from the city or county. Under California law, a complete ADU application must be approved or denied within 60 days, without a public hearing. Contact the Torrance planning or building department for local submittal requirements.

Nearby cities

Free, no obligation

Want real quotes for your ADU?

Tell us about your project. A licensed ADU builder serving your area can contact you with a free consultation and a written estimate.

  • Takes 30 seconds
  • No cost, no obligation
  • We never sell your details to lists